球探网比分

Header phone number

Service consultation hotline

4006891089

Head logo

QR code at the bottom

Scan attention

Official mobile site

Bottom contact

Company Store: F19, Eighth Street, Wuzhou Decoration City, Yingbin Avenue, Panyu District, Guangzhou
Company office address: Room 408, Block B, Wuzhou Decoration City Business Center, Yingbin Avenue, Panyu District, Guangzhou
Contact mobile phone: Miss Zhong 13711569002
Phone: 020-81726130 400-689-1089
Company website: sanqi5.com
公司简介
资质荣誉
新闻中心
工程案例
服务支持
联系我们
  • 3
  • 2
  • 1
Home
>
News Center
>
Company news
>
KABO automatic door installation process

news

NEWS

KABO automatic door installation process

classification:
Company news
2018/01/16 17:49
【Summary】:
One. ES200 installation and debugging instructions II. Engine case installation First check the horizontality / verticality / error 1/1000 of the bearing steel beam. 2. Install the engine case from both sides of the engine case, and install it at an equal distance of less than 400MM. 3. Clean the engine case. three. Installation position of engine mounting components First determine the door opening width. 2. Engine position. Open the door to the right from the center of the engine case and add 100MM to the engine position. 3. Driven wheel position, the door position is measured from the center of the engine box to the left and 100MM is the driven wheel position. four
One. ES200 installation and commissioning instructions
two. Engine case installation
1. First check the horizontality / verticality / error 1/1000 of the bearing steel beam.
2. Install the engine case from both sides of the engine case, and install it at an equal distance of less than 400MM.
3. Clean the engine case.
three. Mounting position of engine mounting parts
1. First determine the door opening width.
2. Engine position. Open the door to the right from the center of the engine case and add 100MM to the engine position.
3. Driven wheel position, the door position is measured from the center of the engine box to the left and 100MM is the driven wheel position.
four. Hanger installation
1. The horizontal and vertical non-inclined double wheels forcefully balance.
2. Top wheel (anti-off wheel) clearance 1-2MM.
Fives. basic requirements
1. The drive is fully installed.
2. Connect the protective ground.
3. The electric eye is connected.
4. Install and connect the program control switch, pulse generator, electric lock and other components.
5. The limit stop is adjusted as follows:
A. When the two-page sliding door is opened to the maximum, it should touch the limit stop installed on the left or right of the guide rail.
B. When closing the door, the central stop should be adjusted until the sliding door sheet contacts the seal.
Door pages must move smoothly. Check if the connecting bolt of the drive belt is against the pulley too long and replace it if necessary.
six. First start operation
1. Move the door leaf to the half-open position.
2. Program switch is set as follows-ES200: "Off"
3. The power door must be closed at a slow speed.
4. Learn when the door is closed.
5. To perform the self-learning operation, press SERVICE, and the "protruding red button" will slowly open the door in the direction of opening the door to release the SERVICE button, and the door will perform self-learning. At the same time, the seven-segment display of the control module flashes, and the door runs slowly to the open position. When the eight-segment display of the control module flashes twice, the system parameters are stored. System self-learning is complete.
6. The menu item P = 0. Must be detected. b = 1 .. r .--- L--A--Modify according to the combination of options.
7. If you have any questions, please call KABO National Service Hotline: 4006891089.
Previous:
Next:

Inner page sidebar

Consultation Hotline

400-689-1089

Address: Room 408, Block B, Wuzhou Decoration City Business Center, Yingbin Avenue, Panyu District, Guangzhou